What does healthcare containment cost?

Healthcare containment is priced from the ICRA class, the size of the work zone and the hours the facility allows work. Higher classes add sealing, an anteroom and more coordination, so they cost more than a simple partition.

  • Linear footage and height: the length of the wall run, and whether it stops at a grid ceiling or goes all the way to the deck.
  • Doors and openings: how many access doors you need, where they go and what hardware they take.
  • Site conditions: ducts, soffits, sloped floors and existing finishes the wall has to fit around.
  • Time on site and phases: how long the walls stay up and how many times the layout moves as the work progresses.
  • Working hours and access: after-hours or weekend installation, elevators, loading areas and parking for the crew.
  • ICRA class: the precautions the class requires, such as sealed joints, an anteroom and openings for negative air.

How does the ICRA class shape the wall plan?

The facility’s infection preventionist assigns a class by matching the type of construction work to the patient risk group in the area. The class decides how solid and sealed the barrier must be. ICRA containment classes explained walks through the matrix.

What a healthcare containment plan includes

  • The containment boundary drawn against the facility’s floor plan
  • Sealed panel joints and perimeter where the class requires it
  • Anteroom and door layout for staff and material flow
  • Openings or placement for the contractor’s negative-air and HEPA equipment
  • Installation hours agreed with the facility, including nights and weekends where needed

Working in an occupied facility

Patients, visitors and staff keep moving through the building during the work. RX plans the wall line around corridors, exits and wayfinding so the facility stays usable, and keeps the occupied side of the wall clean and presentable.

Fire and life safety

Construction barriers in healthcare buildings are governed by the life-safety plan, the authority having jurisdiction and, where they apply, Interim Life Safety Measures. Any fire or smoke rating must be confirmed for your specific project. See are temporary walls fire-rated?