What does construction containment cost?

RX Wall Systems prices construction containment from the scope of the work zone and the standard the facility holds it to. Beyond the length and height of the wall, these change the price:

  • Linear footage and height: the length of the wall run, and whether it stops at a grid ceiling or goes all the way to the deck.
  • Doors and openings: how many access doors you need, where they go and what hardware they take.
  • Site conditions: ducts, soffits, sloped floors and existing finishes the wall has to fit around.
  • Time on site and phases: how long the walls stay up and how many times the layout moves as the work progresses.
  • Working hours and access: after-hours or weekend installation, elevators, loading areas and parking for the crew.
  • Sealing and controls: taped or gasketed joints, an anteroom, and openings for the negative-air equipment your contractor provides.

What does a containment wall include?

Construction containment is a floor-to-ceiling barrier around the work area with a controlled door, planned so that dust and debris stay on the construction side. RX confirms with your team:

  • The containment boundary and the path workers and materials take in and out
  • How the joints, top and bottom of the wall are sealed
  • Where negative-air machines and HEPA filtration will sit (supplied and run by the contractor unless agreed otherwise)
  • The written requirements of the facility, insurer or authority having jurisdiction

How fast can containment be in place?

Containment usually has to be up before demolition starts, so it sits on the critical path. RX plans the installation around your start date and the hours the building allows. Send the drawings and the start date early so the layout can be approved in time.

Is a hard containment wall better than plastic sheeting?

Plastic sheeting is quick and inexpensive for short, low-risk jobs. For longer projects, occupied buildings and anything a facility inspects, a rigid wall holds its seal, takes a real door and stays presentable. The trade-offs are laid out in temporary walls vs. plastic sheeting.

Containment for healthcare and ICRA projects

Hospitals and clinics set containment requirements through an Infection Control Risk Assessment. RX plans healthcare and ICRA containment to the class your infection preventionist assigns. ICRA containment classes explained covers what each class asks for.